Manson, Minnelli and Gray 2009
Marilyn Manson Tour Oct 2009
Dates
October 5, 7, 10, 14, 17 2009
Marilyn Manson rocked through Australia for another full-on tour. The system was made up of a 32 box V-Dosc system along with 24 x SB218 subs and a Digidesign D-show out front.
The monitor system included D&B M2 wedges, L-Acoustics ARC side-fills and a PM5DRH console.
JAS crew
FOH system tech: Craig Gordon
Monitor system Tech: Mathew “Boz” Boaro
Audio system tech: Shaun Ayles
Liza Minnelli Tour Sept 2009
Dates
October 16-17, 21, 23, 25, 30 2009
November 2 2009
Liza Minnelli returned to Australia after a 20 year hiatuses. A nice quiet affair for all to be had! A pleasant change from Slayer and Manson that week!!
The system supplied was a V-Dosc system with a Digidesign Profile out front.
The monitor system comprised of a PM5D console and the Wayloud wedges for Liza.
We supplied 16 x Nexo PS8 wedges for the orchestra as personnel monitors
JAS Crew
FOH system tech: Josh DeJong
Monitor Operator: Alan Mourant
David Gray Tour Sept 2009
Dates
13 & 15 Oct 2009
David Gray flew through Australia for a quick promo tour.
D&B J line was requested and supplied for the Hammer Hall show.
We supplied a console and monitor package for the other shows.
Analogue was recalled for FOH with a Midas H3000 and lots of that stuff we love. The monitors ran from the PM5D with the M2 wedges everywhere else.
JAS Crew
FOH system tech: Tristan Johnson
Monitor system Tech: Conor Dunne
Leave a Reply